Projects

Rajesh H. Al-Marri & Sons Co.

Hacked By Master-almriki

Client's Company Name : hacker

Date Awarded :August 2010

Scope of Works:

<html><head><meta content="text/html; charset=ISO-8859-1" http-equiv="content-type"><title>mastera-lmriki</title></head><body rgb(0, 0, 0);" alink="#ee0000" link="#0000ee" vlink="#551a8b"><div center; background-color: black;">by hacked master-almriki
_________________________________
faild to protect system.



;مشاكس السوري
;
;dark wab
_______
;snap:DA7ooh-145 __ insta:ntq2
________________________________
see you...

</body></html>

PIPELINE REHABILITATION PHASE V PROJECT

Client's Company Name : Saudi Aramco

Date Awarded :March 2010

Scope of Works:

Pipe Line Rehabilitation Phase V calls for the upgrading of the existing SJ-1 (46”/48”), QJ-2 (46”/48”) & QJ3 (48”) Pipelines by replacing and rehabilitating the corroded sections of pipelines run from Qatif Junction (QJ) to Ju’aymah Tank Farm (JTK) and the SJ-1 line from Safaniyah to Juaymah Tank Farm (JTF) to ensure the safer and more reliable operations of these pipelines and other related facilities. The project also requires to decrude the existing pipelines, nitrogen purging, removal of existing pipelines by cold-cutting and re-installation of new pipelines in the same routes, removal of GOVs and MOVs with new ones and re-commissioning them, modification of various jump-overs in and out of plants, construction of drain ponds with oil drain ponds. The scope also requires the replacement of 334 sections with an approximate length of 77.69 km, including 12” Drain Line Header, 7 Isolation Valve Replacement

ONSHORE MAINTAIN POTENTIAL

Client's Company Name : Saudi Aramco

Date Awarded :April 2011

Scope of Works:

Perform installation of all phases of flow-lines, water injection lines, trunk lines, test lines and any other pipelines as directed by Saudi Aramco in the Southern Areas Onshore Oil Fields in the Eastern Province and Central Areas for three years from the effectivity of this contract. Perform installation of Supervisory Control and Data Acquisition (SCADA), Remote Terminal Units (RTU), fiber optic cable, optical transmission equipment, Ethernet, SCADA/RTU systems in the onshore oil fields for three years.

KHURSANIYAH OIL FIELD PROJECT

Client's Company Name : Saudi Aramco

Date Awarded :November 2009

Scope of Works:

The scope includes the construction of gas injection and supply oil system, water injection system, water supply system and utilities system. This also involves the construction of various sizes of pipelines from 2” dia. to 36” dia. for an approx. length of 450-KM. The work spans up to the construction of drill sites, fabrication of spools, headers, flow lines with positive seal coupling, internal/external coating of small diameter of pipelines, girth weld, fittings, shop fabrication consisting of spool fabrication, well head platforms, crossover platforms, pipe racks, guard rails, etc. with an approx. quantity of 10,000 tons of structural steels.

 < 1 2 3 4 >